Solar PV Plant 3 Statements Financial Model with Flexible Timeline, NPV, IRR, Debt Covenants, and Cash Waterfall
Fin-wiser’s Solar Park FM helps the user to assess the financial viability of a solar PV project by capturing all the essential inputs related to construction, operation, and financing.
The Model includes assumptions related to:
1. Development cost, Construction costs and Developer’s Fee
2. Plant Capacity, Capacity Factor & Annual Yield (P50, P90, and P99), Irradiation Factor, Degradation Factor, Production Seasonality,
3. PPA Term, Feed-in Tariff (FiT), Merchant Price and Other revenue sources
4. Variable O&M cost per tonne (divided into 8 subheads such as staff, electricity, consumables, transport, and fuel) and other fixed costs (SPV, insurance, land lease, community payment, management fee & more)
5. Flexible Funding Profile – Cash equity, Bridge Loan, Bank Debt, DSRA, and Bank overdraft
6. Working Capital Assumptions related to accounts receivables and payables
7. Straight Line and Accelerated Depreciation option
8. Annuity, Sculpted Debt and Even Principal Repayment options
9. Inflation and Indexation
10. VAT during the construction and operations phase
11. Decommissioning cost and reserve, if required
Model Output includes:
1. Project IRR & NPV
2. Equity IRR & NPV
3. Minimum and Average DSCR
4. LLCR and PLCR
5. Equity Payback Period
6. Cash Waterfall
7. Debt Service Profile
8. Integrated Financial Statements
9. Fully Integrated Dashboard
Model Package includes:
1. Excel-based financial model (Excel binary format i.e. xlsb)
2. Model Heat Map (FWA Maps) – The file includes a heat map of the model with color codes on
F: Unique formula
<: Formula is a copy of the one to the left
^: Formula is a copy of the one above
+: Formula is a copy of the one to the left and above (i.e. it is a copy of both)
L: Label
N: Numeric input
A: Unique array formula
3. Name Range list (FWA Name Listing) – This file includes information about all names used in the workbook. The Names Listing contains a column labeled “Visible”. A “Yes” in this column means the name is visible (i.e. appears in the list accessed through Formulas Tab|Defined Names|Name Manager). A “No” indicates a hidden name (i.e. a name created by the solver add-in, auto filter names, etc).
4. Macro Word Document – This includes the VBA Code used in the model for the user’s reference
Technical Specifications:
1. Model uses Macros (VBA) especially to consider the interest during the construction phase in the Uses of Funds Table. To run the model optimally, keep macros enabled. In case you do not like Macros, you could manually disable or remove the Macros and will have to rework the model’s logic to be used without Macros but it is not recommended by the author.
2. Model is built using Microsoft Excel 2019 version for Windows. Please note, on certain Mac laptops or MS Excel prior to 2007, Excel with Macros can slow down your computer if your PC does not have enough processing power.
3. We advise not to delete or insert rows and columns into the model if you are not aware of the model structure as it can distort model functioning. If you need assistance with customizing the model template, the author is more than willing to help you. Simply contact us via our custom financial modeling page and send your model template as well as specifications. We will then get back to you with a quotation for the customization service (billable hours & completion date).
4. Model uses Cell Styles
Why Fin-wiser’s Financial Model Template:
1. Our model allows greater flexibility in terms of deciding upon the forecast period length. Users can choose from Monthly, Quarterly, Semi-Annual, or Annual forecast period lengths. This provides more detailed data for Analysis.
2. The model is divided into two phases i.e. Construction and Operations. The user has the flexibility to decide upon each period length individually and can also choose to populate each model phase on a monthly, quarterly, semi-annual, or annual basis.
3. All revenue and cost assumptions can be input into 3 scenarios. This helps the user to assess the impact of multiple business scenarios in one model. This can be operated simply with a click of a button.
4. The Debt funding drawdown has 3 scenarios that can help the user to assess the impact on the IRR and make the best possible negotiations with the financial institutions.
5. The debt repayment has been profiled with 3 scenarios i.e. Annuity payment, Even Principal Payment and Debt sculpted repayment. You can change the scenario with a click of a button and assess the impact on IRR.
6. The model is built with Financial Modeling Best Practice and has clearly defined input, calculations, output cells, and tabs to help even a rookie excel user operate the model efficiently.
7. Our Models are thoroughly reviewed and Quality checked for Arithmetic and Logical flow
Similar Products
Other customers were also interested in...
Battery Energy Pricing Model
The Battery Energy Pricing Model calculates the required energy price for an industrial-scale batter... Read more
Green Hydrogen Project Financial Model (Electrolys...
A Project-Level Financial Model to assess the financial feasibility of setting up and operating a Gr... Read more
Renewable Energy Financial Model Template Bundle
Take this opportunity and get a discount by getting the Renewable Energy Bundle where you get Solar,... Read more
Solar Farm Development Model
Solar Farm Excel Model Template is an excellent tool to assess the financial feasibility of a propos... Read more
Project Feasibility Template – Solar Rooftop
Fin-wiser’s Solar Rooftop FM helps the user to assess the financial viability of a solar... Read more
Solar Energy Financial Model
The Solar Energy Financial Model Excel template forecasts the expected financials for a Solar Park p... Read more
Green Ammonia from Renewable Energy Financial Mode...
This comprehensive 40-year tool aid investors in evaluating potential risks and returns and assess t... Read more
Start Up Solar Farm Excel Model and Valuation
Start Up Solar Farm Excel Model presents the business case of an investment in the construction of a... Read more
Green Hydrogen (Electrolysis) Production Financial...
This green hydrogen financial model template builds a multi-year financial plan to analyze the finan... Read more
Solar (PV) Power Plant – Project Finance Mod...
Project Finance Model providing forecast and profitability analysis for a development and operating ... Read more
Reviews
I purchased this model for assessing solar PV developments. The quality of the model is high, with clear documentation of how it was built. There are some minor errors, such as an data entry cell that is incorrectly made into a drop down list. These can be fixed easily. The main issue with this model is that making amendments is expensive. The developer charges 700 USD per day for short term projects. When requested to make 6 modifications to the tax, depreciation and construction schedule, I was quoted 2 days work or 1400 USD.
248 of 503 people found this review helpful.
Help other customers find the most helpful reviews
Did you find this review helpful?
You must log in to submit a review.