OEE, Machine Downtime & Manufacturing Information Systems

What Is Overall Equipment Effectiveness (OEE)? Overall equipment effectiveness (OEE) is the premier standard for measuring manufacturing productivity. OEE Calculator Spreadsheet Instructions The spreadsheet makes it easier to calculate the individual and combined OEE figures for upto ten machines. Simply enter your data into the relevant white boxes for each machine and click anywhere on the page to update the calculation. Move the cursor over headings for more information. Individual spreadsheets can be copied and stored for later analysis and comparison. To do this make your changes to the main sheet then use the Move or Copy Sheet option on the Edit menu. The spreadsheet is fully editable so you can edit and amend it to meet your needs. Care has been taken to ensure this spreadsheet is correct however we are unable to take liability for any errors or omissions. This Product Contain: 1- OEE – Production, QA& Maintenance Section power point presentation 2- OEE Training Guide-Arabic and english 3- OEE Worksheet pdf 4- OEE-Sheet01 – Efficiency and Effectiveness Mathematical Spreadsheet 5- Example about OEE .

OEE, Machine Downtime & Manufacturing Information Systems
, ,
, , , ,

Overall Equipment Effectiveness (OEE) FAQs

How do I know OEE will work for my company?
Overall, equipment effectiveness is common in manufacturing plants making individual parts (discrete plants). However, it is also often used in refineries to help identify actual output.

How do I get an OEE score for my entire production line?
The best way to get an OEE score for your entire production line is to measure OEE at the piece of equipment or specific machine that handles the majority of the work. In non-balanced production lines, measure OEE at the point of constraint.

Should changeover, preventative maintenance, and lunches/breaks affect my OEE score?
Changeovers are part of one of the six big losses (setup and adjustment) and should be included in OEE. Preventive maintenance and lunches/breaks will probably affect your OEE score as well because they take away time that could be used for production. Exceptions to this include preventive maintenance being done during a planned shutdown and if your machinery can produce parts regardless of whether the operator is on break.

Since a world-class OEE score is 85 percent, should this be my target?
No. While 85 percent is an admirable benchmark, most manufacturers who are new to OEE kick out an OEE score of less than 50 percent. You should set OEE goals that will show improvement over time (usually three to five months).

What’s the difference between OEE and TEEP?
Total effective equipment performance (TEEP) measures how much your operation could manufacture if your plant ran 24 hours a day, seven days a week. In contrast, OEE measures your productivity during planned production time.

What period of time is used to calculate OEE?
It’s up to the manufacturer’s discretion, but the most common period of time is one shift. Other time frames include one job, one day, or continuous monitoring.